PDMS DESIGNER
by AGUS BUDI
(JAKARTA, INDONESIA)
Name : AGUS BUDIONO
Age : 39
Nationality : Indonesian
Total Years Experience : 18
Phones : +62 8119626262/ 8561023000
E-Mail : a_gusb@yahoo.com /Agus.budiono@amec.com
QUALIFICATIONS
Having more than 18 years experience. over 6 years as Sr. Draftsmans
were making Equipment Layout, Piping Plan, Section & Detail, Isometric, Pipe Spool,
Pipe Support Detail and Material take off by AutoCad and
more than 11 years of experience as a Piping Designer,
Were making Equipment Layout, Pipe Routing Plan, Section and Details,
Preparing Isometric, Pipe Support Detail, Material take Off, Nozzle Orientation,
Access Platform, Pipe Support and As Built Drawing.
PDMS Modeling, Were making Equipment modeling, Piping modeling, Pipe Support modeling, Frame Work, and
Isometric draft. involved in Engineering Oil & Gas Industry, Offshore and Onshore. And Petrochemical Plant.
WORKING EXPERIENCES
2007 Present : PT. AMECBerca Indonesia, Jakarta - PDMS-Piping Designer
2006 2007 : PT. DORIS-Singgar Mulia, Jakarta - PDMS-Piping Designer
1997 2006 : PT. TECHNIP Indonesia, Jakarta - PDMS-Piping Designer
1996 1997 : PT. Kokusai Keiso, Jakarta - Piping Designer
1993 1996 : PT. DHV Consulting Engineers, Jakarta - Cad Draftsman
1993 1993 : PT. Koja Bahari Indonesia, Jakarta - Cad Draftsman
1991 1993 : PT. Komatsu Indonesia, Jakarta - Cad Draftsman
COMPUTER CAPABILITY
- PDMS 11.6.
- PDMS Review 6.2
- Auto Cad R12, 13, 14, 2000 to 2008
- Pipe Data Pro-7
- Pipe Support Pro-3
- Microsoft Office (Ms. Excel, Ms. Word, PowerPoint) & Lotus 123
- Link One 4.1 (Data Source)
- Mapping Digitizer
- Adobe Acrobat Rader 5.0 & Photoshop 5.5
PROJECT
PT. AMEC-Berca Indonesia
Oct 2009 Present, ( Assignment to Worley Parsons )
CGPX & Dayung Compression DC-1
Client : CONOCO Phillips Indonesia Inc. Ltd.
Jan 2008 Oct 2009, ( Assignment to Sakhalin Energy )
SAKHALIN II Offshore Facilities Piltun Astokhskoye Platform.
Client : SAKHALIN ENERGY INVESTMENT Co. Ltd.
March 2008 December 2008, TUNU Field Development Project Phase 12, With PDMS.
Client : TOTAL E&P INDONESIE, Location : TUNU Field Kalimantan Timur-Indonesia.
March 2007 March 2008, ( Assignment to Sakhalin Energy )
SAKHALIN II Offshore Facilities Piltun Astokhskoye Platform & LunskoyeLUN A Platform.
Location : Sakhalin Island Offshore Russian Far East
Client : SAKHALIN ENERGY INVESTMENT Co. Ltd.
PT. DORIS-Singgar Mulia
December 2006 March 2007, TUNU Field Development Project Phase 12, With PDMS.
Client : TOTAL E&P INDONESIE, Location : TUNU Field Kalimantan Timur-Indonesia.
PT. TECHNIP INDONESIA (Jakarta Office).
June 2006 December 2006, North Belut Project
Client : CONOCO Phillip, Location : Natuna Sea.
January 2005 June 2006, SISI NUBI Fields Development Project-Phase 1.
Client : TOTAL E&P INDONESIE. Location : Handil, Kalimantan Timur.
July 2004 November 2004, KERISI Development Project
Client : CONOCO Phillip, Location : Nantuna Sea.
PT. TECHNIP INDONESIA (Balikpapan Office).
- CHEVRON INDONESIA COMPANY East Kalimantan Development for SAPI Feasibility Study of Gas Production,
Yakin Central Production Platform-2 Supplement Gas Production,
Pasir Ridge Diesel Fuel Tanks Replacement Phase I & II, Attaka Q Platform Corrosion Repair,
Santan & Serang Wellhead Orientation, Mars Compressor and Taurus Generator For West Seno Project,
Attaka F/FS VLP System, Santan Terminal Oily Water Unit Upgrade,
Lawe-Lawe Terminal New Gross Separator & Degassing Drum, As built Santan Process area,
As built Santan STA Platform, And Kerindingan Facilities Upgrade.
- TOTAL E&P INDONESIE East Kalimantan District Development for CPU Compressor Senipah,
Senipah Oily Water Treatment Up Grade - SNP421, Handil Api Barge Replacement,
Tunu South Oily Water Treatment Up Grade T421, Senipah New Degassing Drum,
As built NPU Fire Water Line (ring main),
Bekapai Well Connection,
Tatun Oily Water Treatment and 30 Well Connection At Tatun South Area